The Sunnica Energy Farm (Amendment) Order 2026

This Order modifies the Sunnica Energy Farm Order 2024 by updating the list of certified documents that govern the energy farm's development.

It replaces specific rows in Schedule 10 of the original 2024 Order to incorporate updated versions of access and rights of way plans, the book of reference, land and Crown land plans, traffic regulation measures plans, and works plans.

These changes apply to the Sunnica Energy Farm project and the Secretary of State for Energy Security and Net Zero.

Arguments For

  • The Secretary of State asserts that the changes are non-material in nature and do not differ significantly from the changes proposed in the application.

  • The document states that the Secretary of State followed required procedures, including considering responses to publicity and consultation required by the 2011 Regulations.

  • The order updates certified documents in Schedule 10 to reflect newer versions of plans and books of reference, which proponents would argue ensures the legal framework matches the actual project requirements.

Arguments Against

  • Legal scholars or affected parties might question the classification of these changes as 'non-material,' as this designation bypasses the more rigorous examination required for 'material' changes under the Planning Act 2008.

  • Local residents or environmental groups might argue that updating land and works plans could change the physical footprint or impact of the project in ways not fully explored during the original consent process.

  • The complexity of referencing multiple versions of plans (e.g., different versions for different sheets of the land plans) could lead to implementation errors or confusion during the construction and operation phases.

Citation and commencement

  1. This Order may be cited as the Sunnica Energy Farm (Amendment) Order 2026 and comes into force on 22nd May 2026.

Amendment to the Sunnica Energy Farm Order 2024

  1. The Sunnica Energy Farm Order 2024 ('the 2024 Order') is amended as follows.

Amendments to Schedule 10 of the 2024 Order

  1. In Schedule 10, omit the following rows in the table-

| access and rights of way plans | 2.3 | 6 | 24/03/2023 | |----------------------------------|-------|-----|--------------| | book of reference | 4.3 | 9 | 30/08/2023 | |-------------------------------------------------------------|-------|-----|--------------| | land and Crown land plans | 2.1 | 6 | 30/01/2023 | |-------------------------------------------------------------|-------|-----|--------------| | traffic regulation measures plans - temporary road closures | 2.4 | 3 | 30/01/2023 | |-------------------------------------------------------------|-------|-----|--------------| | works plans | 2.2 | 5 | 03/03/2023 |

and replace with the following rows-

| access and rights of way plans | 2.3 | 7 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | book of reference | 4.3 | 10 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | land and Crown land plans - sheets 1-19 and 21-22 | 2.1 | 6 | 30/01/2023 | |-------------------------------------------------------------|-------|-----|--------------| | land and Crown land plans - sheet 20 | 2.1 | 7 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | traffic regulation measures plans - temporary road closures | 2.4 | 4 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | works plans | 2.2 | 6 | 27/11/2025 |

Related

The Air Navigation (Restriction of Flying) (Mill Lane, Chipping Ongar) (Emergency) (Revocation) Regulations 2026

Thu 2nd Jul 26

Revoked emergency flight restrictions in the vicinity of Mill Lane, Chipping Ongar, effective July 2, 2026.

Read More

The Digital Waste Tracking (England) Regulations 2026

Thu 2nd Jul 26

Established a mandatory digital system for tracking controlled waste in England, introduced a £26 annual operator fee, and granted the Environment Agency powers to issue civil penalties for non-compliance.

Read More

The Access to the Countryside (Coastal Margin) (Bawdsey to Aldeburgh) Order 2026

Thu 2nd Jul 26

Designated 24th June 2026 as the date ending the access preparation period for the coastal path between Bawdsey and Aldeburgh.

Read More

The Clean Air Zones Central Services (Fees) (England) (Amendment) Regulations 2026

Thu 2nd Jul 26

Increased the central service fee for Clean Air Zone payments from £2 to £4 and extended the fee liability period until 2031.

Read More