The A46 Coventry Junctions (Walsgrave) Development Consent (Correction) Order 2026

This Statutory Instrument, the A46 Coventry Junctions (Walsgrave) Development Consent (Correction) Order 2026, formally amends the original 2026 Development Consent Order concerning the A46 Coventry Junctions project by correcting specific errors and omissions identified in the primary order, as authorized under the Planning Act 2008, with corrections detailed in the accompanying Schedule relating to interpretations, limits of deviation, street stopping up, and various works plans.

Arguments For

  • Ensuring the legal accuracy and implementability of the underlying A46 Coventry Junctions (Walsgrave) Development Consent Order 2026.

  • Providing clarity and removing ambiguity in key definitions, site descriptions, and procedural references within the primary consent order.

  • Following the statutory process outlined in the Planning Act 2008, Schedule 4, to rectify correctable errors identified after the original order was made.

Arguments Against

  • The need for secondary legislation (a correction order) suggests initial vetting or drafting of the primary order contained significant flaws that required subsequent administrative correction.

  • While necessary for technical accuracy, the corrections potentially alter the scope or interpretation of aspects like land acquisition rights, access provisions, or environmental requirements without full public consultation typical of primary planning reviews.

  • Introducing numerous piecemeal changes via correction orders can complicate the ongoing management and understanding of the primary development consent for contractors and regulators.

STATUTORY INSTRUMENTS

2026 No. 556

INFRASTRUCTURE PLANNING

The A46 Coventry Junctions (Walsgrave) Development Consent (Correction) Order 2026

Made

22nd May 2026

Coming into force

27th May 2026

The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 ('the 2026 Order')( 1 ), which granted development consent within the meaning of the Planning Act 2008 ('the Act')( 2 ), contains correctable errors within the meaning of paragraph 1(3) of Schedule 4 to the Act.

In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, before the end of the relevant period as defined in paragraph 1(6)(a) of Schedule 4 to the Act, the Secretary of State received a written request from the applicant( 3 ) for the correction of errors and omissions in the 2026 Order.

In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State informed the relevant local planning authorities, for the area in which the land to which the 2026 Order relates is situated, that the request has been received.

The Secretary of State, in exercise of the powers conferred by section 119 of, and paragraph 1(4) and (8) of Schedule 4 to, the Act, makes the following Order.

Citation and commencement

  1. This Order may be cited as the A46 Coventry Junctions (Walsgrave) Development Consent (Correction) Order 2026 and comes into force on 27th May 2026.

Corrections to the A46 Coventry Junctions (Walsgrave) Development Consent Order 2026

  1. The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 is corrected as set out in the table in the Schedule to this Order, where-
  2. (a) column 1 sets out where the correction is to be made;
  3. (b) column 2 sets out how the correction is to be made; and
  4. (c) column 3 sets out the text to be substituted, inserted, or omitted.

( 1 ) S.I. 2026/537.

( 2 ) 2008 c. 29. Paragraph 1 of Schedule 4 was amended by paragraph 70 of Schedule 13, and Part 20 of Schedule 25, to the Localism Act 2011 (c. 20). There are other amendments to paragraph 1 which are not relevant to this Order.

( 3 ) The term 'applicant' is defined in paragraph 4 of Schedule 4 to the Planning Act 2008.

| Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. | |--------------------------------------------------------------------------------------------------------------------------------------------------|

Signed by authority of the Secretary of State for Transport

Natasha Kopala Head of the Transport and Works Act Orders Unit

Department for Transport

22nd May 2026

Schedule

CORRECTABLE ERRORS

| (1) Where the correction is to be made | (2) Howthe correction is to be made | (3) Text to be substituted, inserted or omitted | |------------------------------------------------------------------------------------------|--------------------------------------------------------------------------------------------|--------------------------------------------------------------------------------------------------------------------------------------| | Article 2(1) (interpretation), definition of 'the 2017 Regulations' | Omit | ''the 2017 Regulations' means the Compulsory Purchase of Land (Vesting Declarations) (England) Regulations 2017;' | | Article 2(1) (interpretation), definition of 'classification of roads plans' | For 'Schedule 11' substitute | 'Schedule 10' | | Article 7(3) (limits of deviation) | For 'paragraph (1)' substitute | 'paragraph (2)' | | Article 10(1)(b) (application of the 1991 Act) | After 'the powers conferred by section 64(a) (dual carriageways and roundabouts)' insert | 'and' | | Article 11(2) (street works) | After 'for the purposes of' omit | 'the sections of' | | Article 17(1) (permanent stopping up of streets and private means of access) | For 'Schedule 3 (permanent stopping up of streets and private means of access)' substitute | 'Schedule 3 (permanent stopping up of highways and private means of access & provision of new highways and private means of access)' |n| Article 18(3) (classification of roads and speed limits, etc.) | For 'developed' substitute | 'development' | | Article 18(6) (classification of roads and speed limits, etc.) | After 'falling within regulation 3(4' insert | ')' | | Article 23(1) (authority to survey and investigate the land) | After 'any land shown within the Order Limits' insert | 'and, where reasonably necessary, any land which is adjacent to, but outside the Order limits' | | Article 29(2) (compulsory acquisition of rights and imposition of restrictive covenants) | For 'Schedule 6 (land in only which new rights etc. may be acquired)' substitute | 'Schedule 6 (land in which only new rights etc. may be acquired)' | | Article 35(9) (application of the 1981 Act) | After 'But see article 36(3)' insert | '(' | | Article 39(9) (temporary use of land for maintaining the authorised development) | For 'paragraph (6)' substitute | 'paragraph (8)' | | Article 42(1) (apparatus and rights of statutory undertakers in stopped up streets) | For '(permanent stopping up of streets)' substitute | '(permanent stopping up of streets and private means of access)' | | Article 43(2) (recovery of costs of new connections) | For 'article 39 (temporary use of land for maintaining | 'article 41 (statutory undertakers)' |

Article 2

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

| (1) Where the correction is to be made | (2) Howthe correction is to be made the authorised development)' | (3) Text to be substituted, inserted or omitted | |------------------------------------------------------------------------------------------------------------------------------------------------------------|--------------------------------------------------------------------------------|--------------------------------------------------------| | Article 45 (existing powers and duties of the undertaker) | For 'the 2000 Act' substitute | 'the 2008 Act' | | Article 47 (operational land for purposes of the Town and Country Planning Act 1990) | After '(cases in which land is to be treated as' insert | 'not' | | Schedule 1 (authorised development) in the preamble of 'In the administrative areas of Coventry City Council and Rugby Borough Council', paragraph (a)(i) | After '2I' insert | ', 3B' | | Schedule 1 (authorised development) in the preamble of 'In the administrative areas of Coventry City Council and Rugby Borough Council', paragraph (a)(ii) | After '1C' insert | ',' | | Schedule 1 (authorised development), Work No. 1A(b) | For 'access plan' substitute | 'access plans' | | Schedule 1 (authorised development), Work No. 1A(c) | For 'traffic regulations plans' substitute | 'traffic regulation plans' | | Schedule 1 (authorised development), Work No. 2A(b) | For 'traffic regulations plans' substitute | 'traffic regulation plans' | | Schedule 1 (authorised development), Work No. 2I | For 'Works Plans' substitute | 'works plans' | | Schedule 2 (requirements), Part 1, paragraph 4(2) | After 'must include the following management plans and method statements' omit | 'and method statements' | | Schedule 2 (requirements), Part 1, paragraph 12 | After 'must be constructed and installed in accordance with' insert | 'the' | | Schedule 2 (requirements), Part 1, paragraph 12 | For 'by or on behalf for' substitute | 'by or on behalf of' | | Schedule 2 (requirements), Part 1, paragraph 13(1) | For 'county planning officer' substitute | 'relevant lead local flood authority' | | Schedule 2 (requirements), Part 1, paragraph 13(3) | For 'article' substitute | 'paragraph' | | Schedule 2 (requirements), Part 1, paragraph 13(3) | For 'of that description listed' substitute | 'described as 'Environmental statement Appendix 13.1'' | | Schedule 2 (requirements), Part 1, paragraph 14(1) | For 'Pre-Commencement Plan' substitute | 'pre-commencement plan' |

| (1) Where the correction is to be made | (2) Howthe correction is to be made | (3) Text to be substituted, inserted or omitted | |-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-------------------------------------------------------|---------------------------------------------------| | Schedule 2 (requirements), Part 2, paragraph 17(3) | For '21 day business period' substitute | '21 business day period' | | Schedule 2 (requirements), Part 2, paragraph 17(4) | For 'part only' substitute | 'only part' | | Schedule 5 (hedgerows and trees), Part 1, column (1), reference nos. H3-7, 13, 16 and 17 | For 'tree' substitute | 'trees' | | Schedule 7 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants), paragraph 4 | After '(modification of Part 1 of the 1965 Act)' omit | ')' | | Schedule 7 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants), paragraph 5(2) | For '1964' substitute | '1965' | | Schedule 7 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants), paragraph 5(2)(a) | After 'or the restrictive covenant imposed' insert | ', or' | | Schedule 7 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants), inserted Schedule 2A, paragraph 1(2) | After 'A46 Coventry Junctions (Walsgrave)' omit | 'Junction' | | Schedule 8 (land of which temporary possession only may be taken), Land plans - Sheet 2 and 2A of 5, plot reference 2/3f | For 'Hungerly' substitute | 'Hungerley' | | Schedule 9 (protective provisions), Part 1, paragraph 2(d)(ii) | After 'sewage disposal works at future date)' insert | a space |

Status:

This is the original version (as it was originally made). This

item of legislation is currently only available in its original format.

EXPLANATORY NOTE

(This note is not part of the Order)

This Order corrects errors and omissions in the A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/537), a development consent order under the Planning Act 2008, following a request under paragraph 1(5)(a) of Schedule 4 to that Act.

Related

The Financial Services Act 2012 (Relevant Functions in relation to Complaints Scheme) (Amendment) Order 2026

Thu 2nd Jul 26

Amended the 2014 Order to update and clarify which regulatory functions of the FCA and PRA are eligible for investigation under the statutory Complaints Scheme.

Read More

The Air Navigation (Restriction of Flying) (Mill Lane, Chipping Ongar) (Emergency) (Revocation) Regulations 2026

Thu 2nd Jul 26

Revoked emergency flight restrictions in the vicinity of Mill Lane, Chipping Ongar, effective July 2, 2026.

Read More

The Digital Waste Tracking (England) Regulations 2026

Thu 2nd Jul 26

Established a mandatory digital system for tracking controlled waste in England, introduced a £26 annual operator fee, and granted the Environment Agency powers to issue civil penalties for non-compliance.

Read More

The Access to the Countryside (Coastal Margin) (Bawdsey to Aldeburgh) Order 2026

Thu 2nd Jul 26

Designated 24th June 2026 as the date ending the access preparation period for the coastal path between Bawdsey and Aldeburgh.

Read More